INPUT CONTROL / DATA HANDLING

Protect the Capacity Intake Boundary.

The first component email needs a part, quantity, material or process, need-by date, and high-level constraint, not protected product data or customer-restricted information.

CAPACITY INTAKE BOUNDARY

What may be sent?

Appropriate context

  • Component or bounded assembly
  • Quantity or practical range
  • Material or manufacturing process
  • Need-by date
  • Current output constraint
  • High-level handoff scope
  • Business contact information

Excluded information

  • Drawings and design files
  • Customer or program identifiers
  • CUI and classified information
  • Export-controlled technical data
  • NDA-protected content
  • Credentials and access information
  • Proprietary process details

Why are these inputs enough for the first review?

The initial decision is whether the urgent component resembles a plausible manufacturing fit within existing factory infrastructure and what clarification is needed. Component, quantity, process, date, constraint, and boundary are enough to frame that decision without exposing the product package.

When can more information move?

Only after the parties identify the information category, contractual basis, authorized identities, facility, system, account, access, storage, transmission, retention, and incident responsibilities. The approved path must be verified before technical material is transferred.

Do not attach protected technical content to the first RFQ email.