CAPACITY INTAKE BOUNDARY
What may be sent?
Appropriate context
- Component or bounded assembly
- Quantity or practical range
- Material or manufacturing process
- Need-by date
- Current output constraint
- High-level handoff scope
- Business contact information
Excluded information
- Drawings and design files
- Customer or program identifiers
- CUI and classified information
- Export-controlled technical data
- NDA-protected content
- Credentials and access information
- Proprietary process details
Why are these inputs enough for the first review?
The initial decision is whether the urgent component resembles a plausible manufacturing fit within existing factory infrastructure and what clarification is needed. Component, quantity, process, date, constraint, and boundary are enough to frame that decision without exposing the product package.
When can more information move?
Only after the parties identify the information category, contractual basis, authorized identities, facility, system, account, access, storage, transmission, retention, and incident responsibilities. The approved path must be verified before technical material is transferred.
Do not attach protected technical content to the first RFQ email.